Live Sites |
Industrial 60kW 135kW 250kW |
Commercial 200kW 200kW 225kW |
Factory 250kW 500kW 500kW |
Municipal 10kW 30kW 100kW 240kW |
Farm 10kW 100kW 250kW |
Rural 10kW 70kW 100kW 470kW |
Utility 4kW 7.8kW 100kW |
Tracker 10kW 50kW 140kW 500kW |
Education 10kW 10kW 74kW 75kW |
Schoolboard Big Green Board |
Retail 2.4kW 7kW 10kW 150kW |
Residential 5kW 6kW 10kW 250kW |
Net Metered 10kW |
Solar Thermal 2kW 4kW 75kW |
LDC DG Connection Requirements
As more distributed generation is added to the grid, LDCs (local distribution companies) are increasingly including remote DG M&C (distributed generation monitor and control) requirements to IPPs as a condition for connection in the CIA (connection impact assessment). This is particularly true of systems above 50kW in heavily loaded urban areas. As renewables become a larger portion of total supply, LDCs need to be able to remotely monitor DG sites and issue shutdown/restart commands from their SCADA (supervisory control and data acquisition) systems.
This requires additional site equipment that can interface to utility protocols DNP3 and IEC61850 using different communication media such as fiber, WIMAX, proprietary radio and 3G cellular as specified by the LDC. Cachelan can design, program and commission this additional equipment to meet each LDC DG M&C requirements necessary for successful grid connection permission.